Phases of a Project

>> PHASE ONE
1.-
Analysis of the special customs procedures.
2.-
Procedures for Tax Exemptions.
3.-
Tariff Classifications.
4.-
Procedures for Quality Standards.
5.-
Route Studies.
6.-
Procedures for securing exceptional transportation permits before authorities.

>> PHASE TWO
1.-
Management of international transportation.
2.-
Charter of ships and aircrafts as required.
3.-
Analysis of required transportation and lifting equipments.
4.-
Port operations for exceptional pieces.
5.-
Management of bonded temporary storage in origin and destination.
6.-
Availability of SPMT or similar equipments for “under hook” download.
7.-
Customs procedures for “direct download”.
8.-
Anticipated customs procedures in urgent cases.
9.-
24/7/365 attention at ports.
10.-
Supervision of loading and unloading with our team of engineers.
11.-
Follow-up on route.

>> PHASE THREE
1.-
Re-exportation logistics for equipments under temporary admission.
2.-
Control of customs balances before customs authorities.
3.-
Control of expiration of temporary admission permits.
4.-
Statistics of processes and KPI of our services.